[image]

Новый итальянский авианосей

Теги:флот
 

Dutch

опытный

и еще фото, есть у кого то его хар-ки?
   
+
-
edit
 

George

опытный

Ну, не такой он уж и новый...

Name No Builders Laid down Launched Commissioned
ANDREA DORIA C 552 Fincantieri June 2001 2005 2007
{ct}

SPECIFICATIONS :
Displacement, tons: 26,500 full load
Dimensions, feet (metres): 769 oa; 707.3 wl x 128 oa; 96.8 wl x 24.6
(234.4; 215.6 x 39; 29.5 x 7.5)
Flight deck, feet (metres): 603.7 x 111.5 (184 x 34)
Main machinery: COGAG: 4 GE/Fiat LM 2500 gas turbines; 118,000 hp(m)
(88 MW) sustained; 2 shafts; cp props; bow and stern thrusters; 6-2.2 MW
diesel generators and 2 shaft generators
Speed, knots: 30. Range, miles: 7,000 at 16 kt
Complement: 486 ship plus 211 air group plus 145 staff (CJTF or CATF/CLF)
plus 360 marines (90 additional marines for short period). Total
accommodation for 1,202 (+90)
Military lift: (garage only): 100 wheeled vehicles or 60 armoured vehicles
or 24 MBTs (Ariete) or mixture

Missiles: 4 Sylver 8 cell VLS for Aster 15.
Guns: 2 CIWS and 3 small calibre
Countermeasures: Decoys: 2 Breda SCLAR-H 20-barrel trainable chaff/decoy
launchers.
TCM: 2 SLAT TCM launchers.
ESM: Radar and Comms intercept [Ref 1].
ECM: Jammer.
Combat data systems: 'Horizon' derivative flag and command support system.
Links 11 and 16; provision for Link 22. Satcom [Ref 2].
Weapons control: FIAR SSAS optronic director.
Radars: Long-range air search: RAN-40S (or S-1850M); D-band [Ref 3].
Air search and missile guidance: EMPAR; G-band [Ref 4].
CCA: SPN-41; J-band.
Surface search: SPS-791; E/F-band [Ref 5].
Navigation: SPN-753G(V); I-band.
Tacan.
Sonars: SNA-2000 mine avoidance sonar (bow dome).

Fixed-wing aircraft: 8 AV-8B Harrier II or JSF.
Helicopters: 12 EH 101 (fitted also for AB 212, NH90 and SH-3D).

TEXT :
Programmes: Following a study phase which included significant changes to
the initial configuration of the Nuova Unita Maggiore (NUM) design, the
Italian government placed a contract with Fincantieri, worth an estimated
US$780 million, for the construction of a ship to replace Vittorio Veneto
in 2007. First steel cut 17 July 2001. Capabilities include afloat
command, air and amphibious operations. The ship is being constructed at
Muggiano (bow) and Riva Trigoso (centre and stern) and will be joined,
outfitted and tested at Muggiano. A second contract, for the development
and supply of the combat system was signed with an AMS-led industrial
group in October 2002.
Structure: The flight deck features six helicopter take-off spots, eight
parking spots and a 12є ski jump. A notional air group includes 12 EH-101
helicopters and 8 AV-8B Harrier IIs. There is provision in the design to
operate JSF and UAVs. The hangar/garage can accommodate various
combinations of aircraft and vehicles (including MBT and trucks). There
are two 30 ton lifts, one forward of the island and the other starboard
side aft. Two Ro-Ro ramps are positioned aft and starboard side. Two 15
ton and one 7 ton lifts are fitted for ordnance and logistic needs
respectively
   

Dutch

опытный

может и не новый, но его фотки я вижу первый раз
   
+
-
edit
 

Kestrel

опытный


Naval Technology

Naval Technology is a procurement and reference site providing a one-stop-shop for professionals and decision makers within the global Defence industry

// www.naval-technology.com
 

   

в начало страницы | новое
 
Поиск
Настройки
Твиттер сайта
Статистика
Рейтинг@Mail.ru