CrazyMk> Ни у кого новой инфы не появилось?
первая фотка вообще - с LiveFist
yippy ya yeah! u made my day...thx man.
Now, is that not a security violation ? As the GOI wanted to refrain from posting photographs of Arihant during the launch.
She truely looks destroyer of enemies.
proud to see it
No hump! Looks streamlined like French Triomphant class. Got more pics? Thanks
Thanks Shiv.
Why does the surface look all wrinkly. Is it b'coz of the presence of anechoic tiles or that's how steel is cut. anyone?
In reality India bacame the first country in Asia to manufacture a nuclear propelled submarine.
// Дальше — livefist.blogspot.com
с Бхарат-Ракшака
http://forums.bharat-rakshak.com/...
INS ARIHANT -PROJECTED COMMISSIONING SCHEDULE -SHANKAROSKY
-4 WEEKS - in water -elctrical and process connection check -reactor start up
-4-6 weeks - reactor system check for leakage ,control rod movement -instrumentation calibration etc
6-10 weeks - night time shallow water run inside Indian territorial waters low speed at 25% reactor power
10-20 weeks - rectification of leakages,loose connections,coolant pump clean up ,instrument calibration ,external sensor calibration
20-36 week - long duration shallow depth run say 50 meters
36-46 week - check up -instrument calibration - feed back analysis ,rectification /replacement of components found defective
46-52 week - extended shallow water run lasting 3 weeks or more
- 52-60 weeks - total check including condition of hull by ultrasonic radiography ,life supprt system like oxygen generator and desalination plant
60 -62 - medium depth submergence in steps of 50 meter of so till normal operating depth of 300 meter
62-66 weeks - check of all external pressure bearing components
66-70 weeks - deep submergence trial in stages of 50-100 meters think in 50 meters increment to nver exceed depth with in stage inspection like that done in 52-60 weeks
70-80 week - reactor to full power in shallow water and then slowly to maximum depth
80-90 weeks - Caliban of sonars ,testing of sonar decoys and torpedo decoys
90 week-98 week wespon trial - 525 mm torpedo -air defense weapons
100 week - test laucnh of agni 3 SL some where near orissa coast to nicobar islands in singles and then one with full salvo laucnh
feed back analysis -rectification one more round of test and induction to indian navt some where in 2011 end
Launch or INS CHITRA (SECOND ARIHANT CLASS ) -2012
LAUCNH OF 3rd ARIHANT - 2014)